On the basis of the refractory polymetallic ore deposit Ozerniy, it is planned to create an enterprise for the extraction and processing of lead-zinc ore with a capacity of 8 million tons per year, as well as the production of zinc and lead-silver concentrates.
There are 13 ore bodies at the deposit, 6 of which are the largest and reach a thickness of 25–30 m. Approximately 37% of all ore reserves are concentrated in ore body no. 8. Ore processing volume per year is 6 million tons.
PROJECT DETAILS
Location: The Republic Of Buryatia, Russia
Type of Contract: Subcontract under LLC “East Contech”
Equipment: Metso-outotec, Roxon, Ural Kran
Activities: Installation of mills, crushers, conveyors, apron feeders, and cranes