KULTUMA GOK

The Kultuma construction site commenced on December 15, 2023, and its construction is still ongoing. The planned completion date is projected as May 15, 2025. At the Kultuma site, Damar Heavy Industries is responsible for the installation of a total of 26,000 WDI NV external pipelines, 4,900 tons of technological equipment, and 3,000 tons of steel assembly works. Currently, 90% of the steel works and 70% of the technological equipment works have been completed, while the installation of technological piping has recently started.

At the Kultuma construction site, which is an industrial gold processing facility, all steel and equipment works in the grinding and crusher buildings are being carried out by us. The installation of 4 mills, hydrocyclones, conveyor lines, lubrication units, crushers, overhead cranes, pumps, and numerous non-standard equipment has been completed and is ongoing.

WhatsApp Görsel 2024-06-15 saat 08.16.47_248fc681
k-1
WhatsApp Görsel 2024-06-15 saat 08.16.44_563dfabe
default
previous arrowprevious arrow
next arrownext arrow
Shadow